5 11 月 2020

巧克力液膏滾輪棈磨1噸設備 Chocolate liquid cream roller grinding 1 ton equipment

Submitted by super

巧克力液膏滾輪棈磨1噸設備
Chocolate liquid cream roller grinding 1 ton equipment

規範機械設備 :
Specification of mechanical equipment:
1.1200L槽桶、雙層夾套304白鐵鋼材質、水介質加熱保溫。
2台=NT$
a.5HP馬達60比1減速機。
b. 攪拌軸心50mm、材質304白鐵鋼材質、滾翻攪拌葉片、桶槽週邊雙刮片、材質304白鐵鋼材質。
. 1200L tank, double-jacketed 304 white iron steel material, water medium heating and heat preservation. 2 sets =US$
a. 5HP motor 60 to 1 reducer.
b. The mixing shaft is 50mm, the material is made of 304 white iron steel, the tumbling mixing blade, the double scraper around the tank, the material is made of 304 white iron steel.
2. 泵浦凸凹型白鐵合金鋼熱硬材質2HP馬達減速機10比1、附加變頻器調速。1台=NT$
. Pump convex-concave white iron alloy steel thermo-hard material 2HP motor reducer 10 to 1, additional frequency converter speed regulation. 1 set = US$
3. 歐洲十三國專利液膏密封加壓精微滾輪式研磨、白鐵合金鋼熱硬材質、20HP馬達/6極附加變頻器,調速、調壓。1台=NT$
Patented liquid paste sealing and pressurizing micro-roller grinding in 13 European countries, white iron alloy steel hot hard material, 20HP motor/6 pole additional inverter, speed and pressure adjustment.
1 set = US$
4. 沙糖粒研磨粉碎機5HP。1台=NT$
5HP Sugar Grinding Mill. 1 set = US$
以上硬體機械設備4項套組總共=NT$
A total of 4 sets of the above hardware machinery equipment = US$
A.備註研討項目費用 :
1. 一般各別4項套操作電器控制費用=
2. 人機介面自動4項套操作,電器控制設定記錄,套組連線費用=
3. 巧克力液膏滾輪棈磨1噸設備,製造研磨指導技術費用=
4. 出差住宿旅費及工資費用=
5. 訂箱及裝貨櫃費用=
A. Remarks for seminar project cost:
1. Generally, 4 sets of operating electrical control costs respectively =
2. Man-machine interface automatic 4 sets of operations, electrical control setting records, set connection costs =
3. Chocolate liquid cream roller grinding equipment for 1 ton, manufacturing and grinding instruction technology cost =
4. Business trip, accommodation and salary expenses =
5. Cost of ordering and loading containers =
B. 備註附款條件 :
1.FOB台灣碼頭出港價2. 預附電匯50%訂金90天,可來料驗貨及試車簽驗3. 訂箱及裝貨櫃4. 電匯尾款50%。
. Remarks attached conditions:
1. FOB Taiwan terminal outbound price 2. Pre-attached wire transfer 50% deposit for 90 days, and can be inspected on incoming materials and test runs 3. Ordering and loading containers 4. Wire transfer 50% of the balance.
November 2, 2019 price

2019年11月2日製價